检索范围:
排序: 展示方式:
Renxing Wang,Zhenyu Liu,Leiming Ji,Xiaojin Guo,Xi Lin,Junfei Wu,Qingya Liu
《化学科学与工程前沿(英文)》 2016年 第10卷 第4期 页码 517-525 doi: 10.1007/s11705-016-1585-z
关键词: calcium carbide kinetic model activation energy pre-exponential factor
Quantitatively assessing the pre-grouting effect on the stability of tunnels excavated in fault
Xiao YAN, Zizheng SUN, Shucai LI, Rentai LIU, Qingsong ZHANG, Yiming ZHANG
《结构与土木工程前沿(英文)》 2019年 第13卷 第6期 页码 1393-1404 doi: 10.1007/s11709-019-0563-1
关键词: pre-grouting stability analysis factor of safety discontinuity layout optimization
《机械工程前沿(英文)》 2022年 第17卷 第2期 doi: 10.1007/s11465-022-0681-7
关键词: inverse kinematics Paden–Kahan subproblems three-joint subproblems product of exponential closed-form solution
Ultrasonic linear motor using the L-B mode Langevin transducer with an exponential horn
SHI Shengjun, CHEN Weishan, LIU Junkao, ZHAO Xuetao
《机械工程前沿(英文)》 2008年 第3卷 第2期 页码 212-217 doi: 10.1007/s11465-008-0026-1
关键词: longitudinal vibration bolt-clamped semiconductor ultrasonic
沈良峰
《中国工程科学》 2007年 第9卷 第6期 页码 94-97
应用趋势型指数平滑模型根据其观测值的数据特点(具线性趋势),选取趋势型二次指数平滑的线性 预测公式和相应at,bt的计算公式及合适的平滑系数值进行计算,预测了某市滑坡区5号监测点的位移量。预 测结果表明,该方法应用于斜坡变形位移的预测,可使预测值与实际位移值之间的误差很小。
赵颜利,平萍,刘凤玉
《中国工程科学》 2008年 第10卷 第7期 页码 147-152
给出了k( k ≥ 3) 阶指数多项式的均匀样条模型。该类模型具有很多与B 样条模型相同的性质,并 且增加了一个可调节的形状参数。由该模型构造的曲线,通过改变形状参数的取值,可以调整曲线接近其控 制多边形的程度。应用于CAD/CAM领域,可作为几何造型的一种新的有效模型。
Lingxuan LIU, Zhongshun SHI, Leyuan SHI
《工程管理前沿(英文)》 2018年 第5卷 第4期 页码 487-498 doi: 10.15302/J-FEM-2018042
This study investigates an energy-aware flow shop scheduling problem with a time-dependent learning effect. The relationship between the traditional and the proposed scheduling problem is shown and objective is to determine a job sequence in which the total energy consumption is minimized. To provide an efficient solution framework, composite lower bounds are proposed to be used in a solution approach with the name of Bounds-based Nested Partition (BBNP). A worst-case analysis on shortest process time heuristic is conducted for theoretical measurement. Computational experiments are performed on randomly generated test instances to evaluate the proposed algorithms. Results show that BBNP has better performance than conventional heuristics and provides considerable computational advantage.
关键词: flow shop energy-aware scheduling learning effect nested partition worst-case error bound
Siu-Lai CHAN, Yaopeng LIU, Andy LEE,
《结构与土木工程前沿(英文)》 2010年 第4卷 第3期 页码 376-382 doi: 10.1007/s11709-010-0086-2
关键词: tension system glass wall nonlinear analysis pre-tensioning second-order analysis
A pre-compensation method of the systematic contouring error for repetitive command paths
D. L. ZHANG,Y. H. CHEN,Y. P. CHEN
《机械工程前沿(英文)》 2015年 第10卷 第4期 页码 367-372 doi: 10.1007/s11465-015-0367-5
For a repetitive command path, pre-compensating the contouring error by modifying the command path is practical. To obtain the pre-compensation value with better accuracy, this paper proposes the use of a back propagation neural network to extract the function of systematic contouring errors. Furthermore, by using the extracted function, the contouring error can be easily pre-compensated. The experiment results verify that the proposed compensation method can effectively reduce contouring errors.
关键词: contouring error pre-compensation motion control system back propagation (BP) neural network
《结构与土木工程前沿(英文)》 2023年 第17卷 第3期 页码 411-428 doi: 10.1007/s11709-023-0928-3
关键词: pre-stressed concrete sleeper ultrahigh performance fiber-reinforced concrete pull-out test static bending test steel fiber aspect ratio volume fraction
Investigation into viability of using two-stage (pre-placed aggregate) concrete in Irish setting
John O’MALLEY, Hakim S. ABDELGADER,
《结构与土木工程前沿(英文)》 2010年 第4卷 第1期 页码 127-132 doi: 10.1007/s11709-010-0007-4
Weihua Zhao, Meixiang Wang, Jianwei Li, Yu Huang, Baikun Li, Cong Pan, Xiyao Li, Yongzhen Peng
《环境科学与工程前沿(英文)》 2018年 第12卷 第5期 doi: 10.1007/s11783-018-1084-1
A novel two sludge pre-A2NSBR system was developed. Advanced N and P removal was optimized to treat real domestic wastewater. Nitrifiers and PAOs were enriched with 19.41% and 26.48%, respectively. Acetate was demonstrated as the high-quality carbon source type.
关键词: Denitrifying phosphorus removal C/N ratio Nitrate recycling Carbon source type Biological nutrient removal Pre-A2NSBR system
Ali Fadhil NASER, Zonglin WANG
《结构与土木工程前沿(英文)》 2013年 第7卷 第2期 页码 164-177 doi: 10.1007/s11709-013-0196-8
关键词: structural performance steel plates external pre-stressing cracks grouting method static
Techno-economic comparison of three technologies for pre-combustion CO
Simon Roussanaly, Monika Vitvarova, Rahul Anantharaman, David Berstad, Brede Hagen, Jana Jakobsen, Vaclav Novotny, Geir Skaugen
《化学科学与工程前沿(英文)》 2020年 第14卷 第3期 页码 436-452 doi: 10.1007/s11705-019-1870-8
关键词: carbon capture and storage (CCS) techno-economic comparison pre-combustion capture physical solvent low-temperature capture
Mohammed FARUQI, Oved I. MATA, Francisco AGUINIGA
《结构与土木工程前沿(英文)》 2018年 第12卷 第3期 页码 352-360 doi: 10.1007/s11709-017-0453-3
Concrete members historically have used either pre-stressed steel or steel bars. In recent years there has been an increased interest in the use of fiber reinforced polymer (FRP) materials. However, the flexure behavior of a hybrid system reinforced by the combination of pre-stressed steel and glass fiber reinforced (GFRP) is still relatively unknown. The purpose of this work is to study this. Two slabs of 100 and 150-millimeter thickness, with a span of 2.1 m reinforced with both pre-stressing steel and GFRP were constructed and tested to failure using ACI 318-11 and ACI 440.1R-15. The concrete had strength of 31 MPa and the slabs were respectively reinforced with 5#4 bars and 3#5 bars. Each slab had 37.41 mm2 prestressing wire with a failure stress of 1722.5 MPa. The experimental flexural strength and deflection of slabs were compared with their respective sizes theoretical slabs. The theoretical slabs were either reinforced with pre-stressed steel or GFRP rebars, or a hybrid system. It was found that the hybrid system produces better results.
标题 作者 时间 类型 操作
Reaction kinetics of CaC
Renxing Wang,Zhenyu Liu,Leiming Ji,Xiaojin Guo,Xi Lin,Junfei Wu,Qingya Liu
期刊论文
Quantitatively assessing the pre-grouting effect on the stability of tunnels excavated in fault
Xiao YAN, Zizheng SUN, Shucai LI, Rentai LIU, Qingsong ZHANG, Yiming ZHANG
期刊论文
General closed-form inverse kinematics for arbitrary three-joint subproblems based on the product of exponential
期刊论文
Ultrasonic linear motor using the L-B mode Langevin transducer with an exponential horn
SHI Shengjun, CHEN Weishan, LIU Junkao, ZHAO Xuetao
期刊论文
Minimization of total energy consumption in an m-machine flow shop with an exponential time-dependent
Lingxuan LIU, Zhongshun SHI, Leyuan SHI
期刊论文
Nonlinear analysis of pre-tensioned glass wall facade by stability function with initial imperfection
Siu-Lai CHAN, Yaopeng LIU, Andy LEE,
期刊论文
A pre-compensation method of the systematic contouring error for repetitive command paths
D. L. ZHANG,Y. H. CHEN,Y. P. CHEN
期刊论文
Experimental and parametrical investigation of pre-stressed ultrahigh-performance fiber-reinforced concrete
期刊论文
Investigation into viability of using two-stage (pre-placed aggregate) concrete in Irish setting
John O’MALLEY, Hakim S. ABDELGADER,
期刊论文
Optimization of denitrifying phosphorus removal in a pre-denitrification anaerobic/anoxic/post-aeration+ nitrification sequence batch reactor (pre-A
Weihua Zhao, Meixiang Wang, Jianwei Li, Yu Huang, Baikun Li, Cong Pan, Xiyao Li, Yongzhen Peng
期刊论文
Evaluation of the static and dynamic structural performance of segmental pre-stressed concrete box girder
Ali Fadhil NASER, Zonglin WANG
期刊论文
Techno-economic comparison of three technologies for pre-combustion CO
Simon Roussanaly, Monika Vitvarova, Rahul Anantharaman, David Berstad, Brede Hagen, Jana Jakobsen, Vaclav Novotny, Geir Skaugen
期刊论文